Mar 302012
Deadlines really motivate me; I suspect I might achieve close to zero if I didn’t utilize them. The current challenge is to finish my second contiguous cardigan by saturday midnight. It’s worsted, yes – but still a whole garment.
I think there’s a good chance; I had to rip the first sleeve because it was too small, and I updated the sizing while knitting the second. Happily, sleeve in a day was achieved.
Next challenge is the front edging; last night I ripped the 2″ I had because I decided some short-rowing would be just the thing. So less than 48 hours for around 25 long 200+ stitch rows. I hope it comes out well.
Well done, that is a fair bit of knitting. I like the detail on the sleeves. I’m interested to see how it all finishes up. Good luck!